Materials before leaving in the morning. 3 EPIAs, a 4U rack-mountable case, cables, power cords, rails, and the shades of the 1U netfinitys
Viewed: 408 times.
|
The cabinet before starting to put machines (you can see the switch up the other side, already mounted)
Viewed: 343 times.
|
The switch, along with the ISDN PRI E1 cable
Viewed: 356 times.
|
Work in progress... configuring VLANs on the switch...
Viewed: 334 times.
|